Industrial Mountaineering Cell

Rope Access equipment

Zener Maritime Solutions has created a niche for itself in the Rope Access Industry. Our inherent knowledge of maritime structures, combined with the skill we have developed over the years, gives us the power to offer customizable solutions to our clients.

For those who are not very familiar with the origins of Rope Access, it dates back to the work that used to be carried out in the North Sea for the offshore industry. It involves rigging of access systems comprising of ropes, knots and points of attachment that are either available naturally or created artificially.

The main objective is to create a complete system that identifies, assesses, and mitigates risks associated with work to be carried out in difficult-to-reach and inaccessible locations.

While its purpose in the offshore industry is quite extensive, Rope Access is rapidly catching on in the maritime industry. With ship operations becoming more and more complex, Rope Access teams offer a great alternative to complete work especially in difficult-to-reach locations.

Benefits of Rope Access with Zener:

  • Flexibility, speed and easy access in difficult-to-reach places
  • Anchor points can be installed in areas where there are limitations
  • Our expert training and work practice standards lead to excellent safety records
  • With our wide network of technicians, we can quickly mobilize manpower
  • We harness a wide skill based manpower to target every type of work
  • Minimal disruptions to assets during operations
  • Cost effective in terms of speed of work, mobilization, capital and rental expenses
  • Environmentally friendly approach

Zener’s Rope Access Services:

Inspections

  • Ultrasonic Thickness Gauging
  • Non-Destructive Testing and Advanced N.D.T
  • Ultrasonic Flaw Detection
  • MPI / LPT Testing
  • Eddy Current Testing
  • DROPS Survey
  • Drone Based Inspection (Coming Soon)

Surveys

  • Live CCTV Camera Surveys
  • Visual and Photographic Inspections

Manpower supply for the following:

  • Cleaning, Blasting and Painting
  • Tank Up Gradation – Chipping and Painting
  • General Maintenance and Assistance in Installation of Equipment
  • Repairing of Cranes, Masts, Life Boats, Accommodations
  • Welding, Steel Repair and Pipe Work
  • Blasting for the Cargo Hold, Outer Hull and Tanks
  • Painting for the Cargo Hold, Outer Hull and Tanks
  • Cleaning and High Pressure Washing for the Cargo Hold, Outer Hull and Tanks

Added advantages

  • Safer than rafting
  • Time saved for erection and dismantling of staging: 7 to 15 days
  • Timely completion of docking